Location:Home > Home > About Shenda > Ukrainian Prime Minister Shmyjar: Russia destroys 50% of Ukraine's power generation capacity
Ukrainian Prime Minister Shmyjar: Russia destroys 50% of Ukraine's power generation capacity
Keywords: power generation capacity, energy industry, thermal power plants

On June 7th local time, Ukrainian Prime Minister Shmyjar stated that the situation in Ukraine's energy industry is very severe, with Russia destroying 50% of Ukraine's power generation capacity. The government is working hard to repair and try to activate more power generation equipment before the heating season.

Shimegar pointed out that currently only 27% of large thermal power plants are still operating. He stated that the government needs to strengthen the protection of the repaired power generation equipment.

上一章: About 60% of Germany's electricity in the first quarter came from renewable energy sources

下一章: Pakistan Tabara Hydropower Station Phase V Expansion Project

分享到:

Feed
Email
Tel
Shenda Electric Group Co., Ltd. (Zhejiang, China)
Dirección: No.17 Huatong Road, Jiangshan Economic Development Zone, Zhejiang Province, PRC
Código postal: 324102
Teléfono: +86-570-4221172, +86-570-4222115
Fax: +86-570-4221132
Correo electrónico: sales@shenda.com